1. Read the requirement before pricing
Confirm the quantity, material, dimensions, delivery location and quote deadline. If a drawing, unit or requirement is ambiguous, ask a specific question before making an assumption. If you can only supply part of the request, clearly name that part.
2. Show how your offer meets the specification
Use the buyer’s item references. State “meets”, “alternative” or “not included” for important requirements, followed by a short explanation. Do not describe a substitution as compliant without identifying the difference. Add relevant technical information rather than a large generic attachment.
3. Present price and timing together
Show the unit, quantity, currency and total. Separate transport, setup, sample and installation charges. Explain applicable tax treatment. State MOQ, quotation validity and what starts your lead time. If stock is available now but not reserved, explain that availability needs reconfirmation at order.
4. Use a structured quotation response
This educational outline is a starting point; it is not a sales contract. Replace placeholders with confirmed information.
Supplier quotation outline
Subject: Quotation for [RFQ reference / purchasing notice] Supplier: [legal company name and contact] Quotation reference / date: [reference, date] Product or service: [exact item / specification version] Compliance and alternatives: [state any deviations] Quantity and unit: [quantity, unit, pack size] Unit price / currency: [amount, currency] Total goods or service price: [amount] Additional costs and tax treatment: [itemised details] MOQ: [minimum quantity and conditions] Lead time: [duration and starting event] Delivery scope and location: [included activities, destination] Payment terms: [proposal] Valid until: [date] Samples / supporting information: [availability] Exclusions: [anything not included] Please contact [name / business email] for clarification.
5. Follow up with a useful answer
Acknowledge clarification requests and keep the same quotation reference when revising. Show what changed rather than silently replacing the document. If you cannot meet the deadline, tell the buyer early and offer a realistic alternative. On Joblios, sign in with your email-verified supplier account and send your quotation through the notice’s private conversation; a public notice is not an order.
Common questions
Can I offer an alternative product?
Yes, if the buyer accepts alternatives. Label the alternative separately, explain the differences and provide separate pricing if needed.
Does sending a quote guarantee an order?
No. A buyer may seek clarification, compare other offers or decide not to proceed. Keep any order and acceptance process separate from the quotation request.
Put the guidance into practice
Adapt the templates to your company’s actual requirement. Create a Joblios account and submit your purchasing notice for review.
Prepare a purchasing notice